January 31, 2016 Travis Dewitz

History of Montana Rail Link’s Gas Train – Historical Railroad Geography Series

The morning Montana Rail Link gas local approaches Paradise as they continue west to Thompson Falls. The gas local is a tank train the hauls Conoco Fuels between Missoula and Pipeline. Pipeline is just east of Thompson Falls. This train fills a missing link in the Yellowstone Pipeline that crosses through the Flathead Indian Reservation after the lease wasn't renewed. The Yellowstone Pipeline runs between Moses Lake, Washington and Billings, Montana. In 1995, the Salish and Kootenai tribes did not renew the 20 year lease to cross tribal lands due to over 70 spills since the pipeline was built in 1954, including three major spills on reservation land. So this gap has been bridged by rail and white tank cars over the 10th Sub.

Montana Rail Link Gas Local – Paradise, Montana

Montana Rail Link Yellowstone Pipeline Gas Train Map Small

Montana Rail Link Gas Local Yellowstone Pipeline Route – Click to Enlarge

The Yellowstone Pipeline runs 531 miles across three states between Billings, Montana and Moses Lake, Washington. The 10-inch pipeline was finished in 1954 and has anchored Billings as the petroleum leader in Montana since. The Yellowstone Pipeline transports finished petroleum products, from refineries in Billings, including aviation fuel, gasoline, and diesel.

In October 1995, there would be a large gap in the pipeline making the line useless. The Salish and Kootenai tribes did not renew the 20 year lease to cross tribal lands due to past ruptures and lack of urgency to cleanup spill sites. There have been over 70 spills since the pipeline was built in 1954, including three major spills on reservation land. The Yellowstone Pipeline Company tried hard to renew the easement and to keep fuel flowing to the Fairchild Air Force Base’s air tanker fleet. They offered as much as $29 million for another 20 year lease the previous lease was only $193,000 and still the Flathead Nation denied this offer. So this gap was bridged by truck and rail between Helena and Thompson Falls until 1998 when a new pipeline to rail facilities was built in Missoula. Most trucking has ceased since the terminal improvements, with Montana Rail Link transporting the finished product in specially built white tank cars.

“The fluid in the line moves at about two miles an hour, surging along the Yellowstone valley, up Livingston hill over Bozeman pass, across the Gallatin valley, along the Missouri river past Townsend and Toston and into Helena, [the] only pumping station on the line outside Billings. Here the pumps lift the fluid over 6,325-foot MacDonald pass west of Helena, highest point on the line. From here the production flows like water down a flume into Spokane.” “Big Yellowstone Pipeline Terminal Here in Operation”, The Independent Record, Helena, MT, 29 August 1954

The Montana Rail Link gas local snakes along the Flathead River just east of Perma, Montana led by MRL 346.

The Montana Rail Link gas local snakes along the Flathead River just east of Perma, Montana led by MRL 346.

yellowstone river pipeline rail transfer station tanks thompson falls mt

Rail to Pipeline Transfer Station in Thompson Falls, Montana.

The MRL has continued to transport the fuel twice daily in trains up to 30 cars long since then, called the gas local. The gas local is a tank train the hauls petroleum products for ConocoPhillips 129 miles between Missoula and Thompson Falls, but I found that the Yellowstone Pipeline is jointly owned by Conoco, Exxon, and Union Oil. The gas local normally uses the scenic 10th Subdivision out of Missoula that was previously closed in the 1980’s by the past owner, Burlington Northern. The MRL reopened the 10th Sub as a secondary route west and to serve the Polson Branch. With the Polson Branch being shuttered in 2011, the Gas Local may be the only thing keeping this line open since this route isn’t ideal for heavier trains up the steep 2.2% grade of Evaro Hill. You can read more about the history of this route and Evaro Hill here. This train continues to fill this missing link in the Yellowstone Pipeline that crosses through the Flathead Indian Reservation even though a new pipeline route through the National Forest service lands was approved in 1996. The approved pipeline route would be mostly built within existing highway right-of-ways. This hasn’t been acting on yet but might be in the future which will end the need for the Gas Local.


travis_dewitz_chicago_l_web

About the Photographer
Travis Dewitz is a professional photographer located out of Eau Claire, Wisconsin. He has been published in many books and magazines including many in the railroad industry. He does a lot of photography work and environmental portraitures for many companies and heavy industries in and around Wisconsin. He has grown up with trains and railroads are one of his passions that he pursues. Contacted him for commercial photography services here.

 

Like and Share with your friends and family!

 

Comments (2)

  1. The 10’th sub was built by the Northern Pacific as a passenger train cutoff and freight bypass being considerable shorter and with faster transit time than the mainline along the Clark Fork River . The North Coast Limited and The Mainstreeter used it up until Amtrak took over all passenger business and the new railroad ran on it for about 12 years before discontinuing passenger operations.

  2. Sean Taylor

    Actually there were three additional pumping stations along the line when the entire line was intact between Helena and Spokane, WA. Drummond, Missoula, and Thompson Falls

Leave a Reply

Your email address will not be published. Required fields are marked *